HIP, Heidelberg
Cooling supply for a green data center and local cooling network with emergency supply
What our clients say
Full air conditioning was planned for the renovation of an office building. The existing power supply was not sufficient for the required cooling capacity at peak times. Rather than having to make costly upgrades to the existing power supply, the ice storage system offered a cost-effective and quick way of ensuring the required peak cooling capacity. With the support of sp.ICE GmbH, the renovation was successfully completed on time and on budget.